01
Request a quote
Send Gerbers, a bill of materials, and quantity. A person in Greene reads it the same day.
Electronic and electromechanical assemblies for industrial, instrumentation, and automotive applications: board assembly, wire harnesses, and enclosure integration.
| Parameter | Value | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Standards and approvals |
|
||||||||||||||
| Industries served | Robotics, Commercial aerospace, Industrial automation, Instrumentation, Power electronics, Automotive | ||||||||||||||
| Service area | Nationwide, shipped from Greene, New York | ||||||||||||||
| Founded | 1977 | ||||||||||||||
| Lead time, typical | 2 to 4 weeks, turn-key PCBA | ||||||||||||||
| Facility | 25,000 sq ft, Greene, NY 13778 | ||||||||||||||
| SMT lines | 3 | ||||||||||||||
| Operating hours |
|
Every board that leaves the line has passed automated optical inspection and, where called for, functional test on fixtures we design and build in house.
| Axis | GC Controls, Greene NY | Offshore contract build |
|---|---|---|
| Approvals | Toyota approved supplier; assemblies inspected to IPC standards under the Toyota Quality System. | Approvals vary by facility; audit trail can require translation and travel. |
| Origin and traceability | Domestic build in Greene, New York with full lot, reel, and operator traceability. | Multi country supply chain; lot and reel data reconciled after the fact. |
| Lead time | Two to four week lead times, typical, for turn-key PCBA. | Six to twelve weeks, plus ocean freight and customs. |
| Communication | Same time zone as your engineering team; a direct line to engineering. | Twelve hour offset; escalation through a program manager. |
| Test | Custom test fixtures designed and built in house for functional test. | Test fixtures quoted separately, often at a third house. |
Send Gerbers, a bill of materials, and quantity. A person in Greene reads it the same day.
We walk the BOM, flag alternates, and confirm process fit for surface mount, through hole, or wire harness.
Kit is staged, boards are placed and reflowed, AOI runs on the line, and functional test runs on fixture.
Approved first article moves to scheduled production with lot, reel, and operator records on file.